Kleer Specifications - Architectural Binder

Design Content - Products, Listings & Specifications.

View Now

Kleer Installation Instructions

Kleer Installation Guidelines are suggested techniques to be used when installing Kleer PVC products under typical conditions.

View Now

Why Exceed the Code: Maximizing Energy and Cost Savings in Pipe Insulation

Thermal insulation aids in stabilizing process temperatures; can minimize moisture condensation on below ambient temperature piping surfaces; increases fire protection; and contributes to noise abatement. Personnel protection against burn injury is a major benefit from thermal insulation. The Occupational Safety and Health Administration (OSHA) requires that “all exposed steam and hot-water pipes within 7 feet of the floor or working platform or within 15 inches measured horizontally from stairways, ramps, or fixed ladders shall be covered with an insulating material, or guarded in such manner as to prevent contact. In addition, the Insulation Institute provides other succinct reasons for insulating pipes beyond many current state and local code thickness requirements.

ASHRAE 90.1 minimum pipe insulation thicknesses are required for compliance with energy-efficient building design relative to many new buildings, building additions, and retrofit construction. A vapor retarder, which is required in addition to the insulation, will further reduce the likelihood of corrosion due to condensation on cold pipes. Finally, while insulation cannot prevent standing water in pipes from freezing, it can slow the process. This course will enable learners to analyze material types that may ultimately affect the long-term safety and wellness of occupants. By thoroughly examining ASHRAE 90.1, the need for building professionals to exceed the local code requirements will become apparent. Finally, the course will focus on utilizing software to specify pipe insulation, which will influence the project budget, energy-efficiency of a structure, and the long-term safety and wellness of occupants.

Register

DesignRail®Rail Kits Brochure (Install between wood posts)

Aluminum rail kits are designed for fast and easy installation of railings with cable rail stainless steel infill between your posts.

View Now

DesignRail® LED Lighting Kits Brochure

Easy to use kits that integrate into the top or bottom rail to provide a beautiful under rail lighting and a more finished look.

View Now

DesignRail® Aluminum Railing Frames Brochure

DesignRail® by feeney aluminum railing frame systems combine the durability of aluminum with innovative design details to ensure lasting beauty, structural integrity and affordability while drastically reducing long term maintenance expenses.

View Now

CableRail Quick-Connect® Fittings Brochure

The fast and easy way to create your own custom assemblies, our Cable Rail standard assemblies are an easy to use option for most railing installations, but some projects have construction or design needs that require a different solution.

View Now

CableRail Assemblies: Make your railings view friendly!

Easy-to-install, prefabricated cable assemblies are an attractive, budget-friendly, and low-maintenance alternative to commonly used metal and wood picket infill.

View Now

RIDGID GEN5X 18 Volt 5-Piece Combo Kit

RIDGID® raises the bar with merciless power, fierce speed and industry leading innovation in the next generation of 18-volt tools. GEN5X™ Permanent Magnet Motors deliver Best-In-Class power, performance and runtime. All GEN5X™ tools are packed with industry leading features like the innovative chuck light, a cordless circular saw with corded performance, and the only cordless orbital action reciprocating saw.

View Now

RIDGID 18V Brushless HyperDrive Nailers

TV host and licensed general contractor, David Sheinkopf, introduces the newest innovation from RIDGID Power Tools. The new 18v HyperDrive brad and finish nailer requires no compressor, hose or gas cartridge, and feature brushless motors giving them pneumatic like power and run time.

View Now